Recently completely a project for Carmen and Luis, replacing their back steps and adding some railing to their deck. I removed the old steps and constructed new ones from treated lumber, then painted the new steps to match.
The old steps were falling down and rotted, (Not a moment too soon to replace them!):
Freshly constructed steps, now anchored to the brick pillars; reinforced with three stringers, not two; nor more untreated wood. These steps should last a lot longer. I've added a seventh step to achieve a normal step height:
The final product, painted to match the existing deck:
Obviously, the choice was to make the steps fit into the existing color scheme. Not matter what, they are much stronger and sturdier than the previous ones.
No comments:
Post a Comment